These plots show the drift-corrected value for an input ADC of 100 for PMT-based corrections (black points with errors) compared with PIN-based corrections (coloured lines, each colour is one pixel-spot). Points are plotted at an interval of 7 days from the period March 1st 2004 to September 1st 2005. The reference point for the PIN-based corrections is taken from the June 2005 gain curve.
The following files each contain the plots for one PMT, with one plot per pixel, as shown on 29/09/05.
The following files each contain the plots for a whole rack bay, again with one plot per pixel.
These following plots show the drift-corrected value for an input ADC of 100 for PMT-based corrections (black points with errors) compared with PIN-based corrections averaged over all spots on a pixel (coloured lines, each colour is one pixel). Points are plotted at an interval of 7 days from the period March 1st 2004 to September 1st 2005. The reference point for the PIN-based corrections is taken from the June 2005 gain curve. The files each contain the plots for a whole rack bay, with one plot per tube.
These following plots show the drift-corrected value for an input ADC of 100 for PMT-based corrections (black points with errors) compared with PIN-based corrections averaged over all spots on a tube (coloured lines, red is all spots, green exludes the highest and lowest spot for each point; the two are often superimposed). Points are plotted at an interval of 7 days from the period March 1st 2004 to September 1st 2005. The reference point for the PIN-based corrections is taken from the June 2005 gain curve. The files each contain the plots for a whole rack bay, with one plot per tube.